Arcade-Cripple Creek Trail Project (formerly Electric Greenway Trail Project)

Project Description:

The City is constructing a 2.9 mile long multi-use trail between Sunrise Boulevard (near Arcade Creek Park Preserve) and Wachtel Way that will largely follow an existing Sacramento Municipal Utility District (SMUD) electric corridor easement. The project is located in the City and unincorporated Orangevale, and connects several neighborhoods to eight parks, several schools and the Sunrise MarketPlace. In addition to a paved multi-use trail, this Project also includes:

• A new signalized crossing of Fair Oaks Boulevard
• Pathway lighting
• Sidewalk, curb and gutter along a segment of Oak Avenue
• Drainage improvements
• Traffic signal modifications
• Landscaping

Construction Schedule & Notices:

Construction is underway and anticipated to continue until May 2024. 


Contact:

For questions about the project, please contact the General Services Department at 916-727-4770.